Quoting from drawings
Quotes from technical drawings in minutes, not days.
AI reads PDF, DXF and STEP drawings, extracts materials, operations and times, and drafts the quote in your format.
Request a diagnosticThe problem
Your estimators spend hours per request reading drawings, measuring parts and checking prices. Requests pile up, answers go out late, and the quotes that win are the ones that went out first.
How it works
01
Reads the drawing
Dimensions, materials, tolerances, finishes and quantities are extracted from PDFs, DXF and STEP files.
02
Applies your rules
Your machine rates, set-up times, material prices and margins, not generic estimates.
03
Drafts the quote
A ready-to-review quote in your template and ERP, with every assumption visible to the estimator.
04
Learns from history
Past quotes and actual job times calibrate the estimates over time.
Connects to
- PDF / DXF / STEP drawings
- Price lists and supplier quotes
- ERP (SAP B1, PHC, Primavera)
- Historical jobs and times
What we measure
Time to answer a request for quote, and quotes sent per estimator per week.
Questions
Does the AI send quotes on its own?
No. It prepares the quote and shows its assumptions; an estimator reviews and sends it.
What if our drawings are scanned or hand-annotated?
Scanned PDFs work. During the diagnostic we test a sample of your real drawings before committing to a pilot.
Is this a fit for your plant?
The diagnostic tests it on your real data before you commit to a pilot.
Other solutions
Visual quality inspection
Cameras and computer vision inspect every part, flag defects in real time and keep a record per batch.
Measured byReject rate, escaped defects and customer complaints.
Learn morePredictive maintenance
Vibration, temperature and energy data reveal wear early, so maintenance is planned instead of urgent.
Measured byUnplanned downtime, OEE and maintenance cost per machine.
Learn moreProduction planning
Orders are sequenced by capacity, due dates and materials, and re-planned in minutes when something changes.
Measured byOn-time delivery, overtime hours and planner time spent re-planning.
Learn more