Predictive maintenance
Know which machine will fail before it stops the line.
Vibration, temperature and energy data reveal wear early, so maintenance is planned instead of urgent.
Request a diagnosticThe problem
Breakdowns stop the line at the worst moment, preventive maintenance replaces parts that were still fine, and nobody has time to watch the data the machines already produce.
How it works
01
Collects machine signals
From existing PLCs and sensors, or retrofitted vibration and current sensors on older machines.
02
Learns normal behaviour
Each machine gets its own baseline, so alerts are about real anomalies, not noise.
03
Warns early
Alerts with the likely cause go to the maintenance team and can open work orders automatically.
04
Improves the plan
Maintenance intervals move from the calendar to the actual condition of each asset.
Connects to
- PLCs (Siemens S7, Modbus)
- OPC UA / MQTT
- Retrofit vibration and current sensors
- Maintenance history (CMMS)
What we measure
Unplanned downtime, OEE and maintenance cost per machine.
Questions
Our machines are old. Does this still work?
Often yes, with retrofit sensors that don't touch the machine's controller. We assess this during the diagnostic.
How long until predictions are useful?
Anomaly alerts can start within weeks. Failure prediction gets better as the system sees more history.
Is this a fit for your plant?
The diagnostic tests it on your real data before you commit to a pilot.
Other solutions
Quoting from drawings
AI reads PDF, DXF and STEP drawings, extracts materials, operations and times, and drafts the quote in your format.
Measured byTime to answer a request for quote, and quotes sent per estimator per week.
Learn moreVisual quality inspection
Cameras and computer vision inspect every part, flag defects in real time and keep a record per batch.
Measured byReject rate, escaped defects and customer complaints.
Learn moreProduction planning
Orders are sequenced by capacity, due dates and materials, and re-planned in minutes when something changes.
Measured byOn-time delivery, overtime hours and planner time spent re-planning.
Learn more